The building is constructed in timber framing with plaster panels.
At the sides and above the window is more timber framing with panels similar to those on the third storey.
The timber framed Gothic city hall has been a listed historical monument since 1928.
The outside walls are of load bearing stone with heavy timber framing on the interior.
The timbers framing the balcony were dark with water.
The building is constructed in timber framing with fillings of red brick and white windows.
The fire started at Shirehall plain and quickly spread through the mainly timber framing houses of the town.
On the exterior of the church is apparent timber framing with rendered infill.
Without tower, timber framed and built in minimal time they appeared more like commercial construction, a sparse look which was intended.
The lodge is built of stone, and does not contain timber framing like the nearby Hospitium.
The heavy timber framing is supported by a fieldstone foundation.
An interconnected wing with timber framing is the only preserved part of the previous complex from 1603.
The previous wine-press is a timber framing of 1659.
The original timber framing has been replaced by reinforced concrete on the lower stories.
Much of the timber framing is exposed throughout the house.
Much of the timber framing has been replaced by brick at the rear of the house.
The timber framing was prefabricated in Brisbane and shipped to the site.
The 15th-century timber framing is still visible in the inner walls.
Compared with other counties, timber framing is important.
The timber framing was almost completely destroyed by dry rot and wood worms.